{"id":959,"date":"2025-02-22T16:05:14","date_gmt":"2025-02-22T11:35:14","guid":{"rendered":"https:\/\/weezharoz.com\/en\/?p=959"},"modified":"2025-02-22T16:05:14","modified_gmt":"2025-02-22T11:35:14","slug":"inauguration-of-a-25-4-million-energy-infrastructure-project-in-kabul","status":"publish","type":"post","link":"https:\/\/weezharoz.com\/en\/inauguration-of-a-25-4-million-energy-infrastructure-project-in-kabul\/","title":{"rendered":"Inauguration of a 25.4 Million Energy Infrastructure Project in Kabul"},"content":{"rendered":"<p><strong><span style=\"color: #993300;\">Weezha Roz<\/span>-Kabul<\/strong>-The project, which has been executed in cooperation with the Ministry of Water and Energy and the private company &#8220;Ofi Bahram,&#8221; consists of two main parts:<br \/>\n1. The Baghak substation with a capacity of 189 MVA.<br \/>\n2. The 220 kV transmission line connecting Argandi to Baghak.<\/p>\n<p>The main objective is to absorb and distribute electricity imported from the 500 kV Turkmenistan line and improve electricity coverage in Kabul.<\/p>\n<p>Mullah Abdul Latif Mansoor (Acting Minister of Water and Energy):<br \/>\n&#8220;This project is a key step in utilizing the Turkmenistan transmission line.<\/p>\n<p>Our ministry has made significant achievements in the two critical sectors of water and energy and will continue its efforts.&#8221;<\/p>\n<p>Aminullah Obaid (Governor of Kabul):<br \/>\n&#8220;Since the beginning of the Islamic Emirate\u2019s work, major achievements have been made in the fields of development and infrastructure, especially in ensuring electricity for the citizens of Kabul.&#8221;<\/p>\n<p>Mohajer Farahi (Deputy Minister for Information and Culture):&#8221;Just as the Islamic Emirate sacrificed for the freedom of the country, it is now working day and night for the prosperity and progress of Afghanistan.&#8221;<\/p>\n<p>Haji Pahlawan (Head of Ofi Bahram Company):&#8221;This company is committed to continuing investment in energy projects.<\/p>\n<p>Cooperation with the Ministry of Water and Energy is a successful model of government and private sector partnership.&#8221;<\/p>\n<p>With the commissioning of this project, a significant portion of the electricity imported from Turkmenistan will be absorbed, and Kabul\u2019s electricity distribution network will be strengthened.<\/p>\n<p>This move will not only reduce the power shortage but also create an environment conducive to attracting further investments in the energy sector.<\/p>\n<p><strong>Background<\/strong>:<\/p>\n<p>The 500 kV Turkmenistan-Afghanistan power transmission line is a key regional project that allows for the import of 1.4 billion kilowatt-hours of electricity annually.<\/p>\n<p>Completing the related infrastructure, such as the Baghak substation, plays a critical role in fully utilizing this capacity.<\/p>\n<p>Weezha Roz<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Weezha Roz-Kabul-The project, which has been executed in cooperation with the Ministry of Water and Energy and the private company &#8220;Ofi Bahram,&#8221; consists of two main parts: 1. The Baghak substation with a capacity of 189 MVA. 2. The 220 kV transmission line connecting Argandi to Baghak. The main objective is to absorb and distribute &hellip;<\/p>\n","protected":false},"author":2,"featured_media":960,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-959","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economic"],"_links":{"self":[{"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/posts\/959","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/comments?post=959"}],"version-history":[{"count":0,"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/posts\/959\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/media\/960"}],"wp:attachment":[{"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/media?parent=959"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/categories?post=959"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/weezharoz.com\/en\/wp-json\/wp\/v2\/tags?post=959"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}